-
DOKE navigation and sighting data from the Aerial survey - Mar-May 2017
The excel file contains 3 sheets of which 'Explanation' includes a description of the fields in the other two sheet. Data include date, time, position every 1 second of the... -
DOKE Distance project plan for the aerial survey
The aerial survey was planned using the free software Distance (distancesampling.org). The survey includes a total of 217 transects spaced between 5 and 6 km and generally...